skip to Main Content

How can we help?

Emergency bridge repair after road traffic accident

The Brief

Triangle was briefed to carry out a full, emergency repair to a bridge wall that was in danger of collapsing onto a gas main. Although many of our projects are concrete and steel, when it comes to bridges, we have many years’ experience with brickwork.

The Challenge

The challenge was working over water and above a gas main. It was vital to carefully dismantle the damaged section without presenting a danger to the pipeline. All work was carried out off a pontoon and under a full road closure.

The Result

The repaired footbridge was built to exactly match the existing, although the old copings were removed to match the far side of the bridge.

KEEP IN TOUCH

GET IN TOUCH

Office:
Unit 32 Glasshouse Studios, Burgate, Fordingbridge, Hampshire SP6 1QX

Email:
info@triangleltd.co.uk

Enquiries:
01425 656 466

CHAS-Elite-Logo